Place of Origin: | GERMANY |
Brand Name: | LENZE |
Certification: | CE |
Model Number: | E82ZAFVC010 |
Minimum Order Quantity: | 1pcs |
---|---|
Packaging Details: | carton |
Delivery Time: | in stock |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 100pcs/week |
LENZE: | LENZE | E82ZAFVC010: | E82ZAFVC010 |
---|---|---|---|
Temperature: | 20-90 | Color: | Black |
Dimension: | 80mm | Wire: | Wire |
Material: | Iron |
![]() ![]() ![]() |
H-CPU fails or is being maintained, the lighting and fan control continues to function. The tunnel does not need to be blocked. |
Signals are recorded and output directly in the ET 200SP distributed I/O systems in the |
Monitoring of the system and targeted information of the operating engineers in real time | tunnel. There are no long cable runs.erform the following tasks for implementation of the example: Table 1- 1 Procedure for tunnel automation |
Reliable monitoring and control of the tunnel facilities over large distances, up to 10 km between the two H-CPUs |
Step Procedure Further information 1 Configure hardware in STEP 7: |
Configure the assembly with 2 H-CPUs, 3 ET 200SP stations with their
I/O modules and 2 Comfort Panels.
Section Configuring (Page 19)
2 Creating a user program in STEP 7:
• Program the user program in an organization block.
• You create an HMI screen.
Section Programming (Page 34)
3 Installing modules and wiring the assembly:
• Install all modules.
• Wire the load current supply, the modules in the PROFINET ring,
the redundancy connections and the Comfort PanelsCommissioning the example:
• Insert the SIMATIC memory cards in the H-CPUs.
• Switch on the load current supply and the CPUs.
• Assign redundancy IDs to the CPUs in the configuration on commissioning.
• Load the project data (hardware configuration and user program) to
the CPUs.
• Check the LEDs and evaluate the information on the CPU displays.
• Test how the example works.The following hardware and software is available for processing the example:
Table 1- 2 Hardware/software requirements
Hardware/software Modules//Versions
2 H-CPUs with synchronization
modules and SIMATIC
Memory Cards
• 2 identical 1517H-3 PN CPUs with identical article numbers, function versions and firmware
version
• 4 synchronization modules for cables up to 10 km in length (6ES7960-1FB00-0AA5)
• 2 SIMATIC Memory Cards e.g. with 256 Mbyte capacity (6ES7954-8LL02-0AA0)
3 ET 200SP distributed I/O
systems
2 ET 200SP for tunnel sections 1 and 3 each consisting of:
1 interface module IM 155-6 PN HF (6ES7155-6AU01-0CN0), FW version V4.2 or later
(with system redundancy S2)
• 4 digital output modules:
– 2 DQ 4x24VDC/2A ST each with a light-colored BaseUnit, BU type A0: BU15-
P16+A0+2D
– 1 DQ 4x24VDC/2A ST with a dark-colored BaseUnit, BU type A0: BU15-P16+A0+2B
– 1 DQ 4x24..230VAC/2A HF with a light-colored BaseUnit, BU type U0: BU20-
P16+A0+2D
• 1 analog input module:
– AI 4xU/I 2-wire ST with a dark-colored BaseUnit, BU type A0: BU15-P16+A0+2B
• 1 server module
1 ET 200SP for tunnel section 2 consisting of:
1 interface module IM 155-6 PN HF (6ES7155-6AU01-0CN0), FW version V4.2 or later
(with system redundancy S2)
• 2 digital output modules:
– 1 DQ 4x24VDC/2A ST with a light-colored BaseUnit, BU type A0: BU15-P16+A0+2D
– 1 DQ 4x24..230VAC/2A HF with a light-colored BaseUnit, BU type U0: BU20-
P16+A0+2D
• 1 analog input module:
– AI 4xU/I 2-wire ST with a dark-colored BaseUnit, BU type A0: BU15-P16+A0+2B
• 1 server module
2 HMI devices TP1900 Comfort
2 load current supplies for
R/H
PM 190 W 120/230 V AC
3 load current supplies for
ET 200SP
Load current supplies with 24 V DC output voltage (with safe electrical isolation)
Accessories 1 mountin
v