Sales & Support : Request A Quote
English
Home ProductsAMETEK

LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0

LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0

    • LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0
    • LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0
    • LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0
  • LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0

    Product Details:

    Place of Origin: GERMANY
    Brand Name: LENZE
    Certification: CE
    Model Number: E84AV-BDE2224SX0

    Payment & Shipping Terms:

    Minimum Order Quantity: 1pcs
    Packaging Details: carton
    Delivery Time: in stock
    Payment Terms: T/T, Western Union, MoneyGram
    Supply Ability: 100pcs/week
    Contact Now
    Detailed Product Description
    LENZE: LENZE E84AV-BDE2224SX0: E84AV-BDE2224SX0
    Germany: Germany Temperature: 20-90
    Wire: Wire Material: Iron
    Color: Black Dimension: 80mm

    LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0LENZE E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0 E84AV-BDE2224SX0

    an low speed → Contactor K5 actuated The lamps are dimmed via the Phase angle control - Phase angle proportional function of
    the digital output mode:
    Fan high speed → Contactors K3 and K4 actuatedThe following figure shows the wiring of the light control on the DQ 4x24..230VAC/2A HF L1 → Entry light
    ● L2 → Interior ligCreate a new project and add the CPU 1517H-3 PN and the 3 ET 200SP distributed I/O
    digital output module ⑥ L1 → Entry light
    ● L2 → Interior ligCreate a new project and add the CPU 1517H-3 PN and the 3 ET 200SP distributed I/O

    ystems. Network the assembly to a PROFINET ring.
    Add 2 HMI devices TP1900 Comfort to the assembly.
    You do not configure the PM 190 W 120/230 V AC load current supplies.
    Requirement
    You have set the address of the PG/PC, 192.168.0.50 in the example.
    Creating a project and assigning hardware
    1. Create a new project in STEP 7. Give the project the name "H_GS"Select "Configure a device" and then "Configure networks".
    The network view opens.
    3. Select CPU 1517H-3 PN from the hardware catalog in the network view.Drag and drop the CPU to the task window in the network view.
    Results:
    – STEP 7 automatically creates both 1517H-3 PN CPUs for the redundant system.
    – STEP 7 automatically assigns the MRP role "Manager (auto)" to the PROFINET
    interfaces X1 of both CPUs.
    – STEP 7 displays both CPUs in the network view graphically.5. Select an ET 200SP interface module IM 155-6 PN HF (article number 6ES7155-6AU01-
    0CN0) from the hardware catalog.
    6. Drag and drop the interface module to the task window in the network view.
    7. Drag and drop 2 further IM 155-6 PN HF interface modules to the task window in the
    network view.
    8. Select a SIMATIC Comfort Panel TP1900 Comfort from the hardware catalog as an HMI
    device.
    Recommendation: Configure the HMI devices with the HMI Device Wizard (Page 30).
    9. Drag and drop the TP1900 Comfort to the task window in the network view.
    10.Drag and drop a further TP1900 Comfort to the task window in the network view.
    Results: The project has been created. The hardware components have been inserted.
    addresses for the PROFINET interfaces of the devices have been automatically assigned.To assign the ET 200SP distributed I/O systems to H on a system-redundant basis,
    connect every IM 155-6 PN HF interface module to every CPU.

    o do so, proceed as follows:
    1. Drag-and-drop a line between the PROFINET interface of IM 155-6 PN HF and
    PROFINET interface X1 of the left-hand CPU.
    2. Drag-and-drop a line between the PROFINET interface of IM 155-6 PN HF and
    PROFINET interface X1 of the right-hand CPU.
    3. Assign the two other IM 155-6 PN HF devices to the two CPUs in exactly the same way.
    Result: The distributed I/O system ET 200SP are connected to H on a systemredundant
    basis.You create two redundancy connections between the H-CPUs via fiber-optic cables using a
    total of four synchronization modules (two in each H-CPU). You replace the synchronization
    modules (for cables up to 10 km in length) in STEP 7.
    STEP 7 automatically assigns an address to each PROFINET interface of a CPU. You
    can also assign the addresses manually. For PROFINET interface X1 of the CPUs, the
    addresses must be located in the same subnet. In the example you accept the preset
    addresses.

    Contact Details
    Guang Zhou Lai Jie Electric Co.,Ltd

    Contact Person: Mr. Tommy

    Tel: 86-020-87268766

    Fax: 86-020-87269099

    Send your inquiry directly to us (0 / 3000)