Sales & Support : Request A Quote
English
Home ProductsAMETEK

LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C

LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C

    • LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C
    • LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C
    • LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C
    • LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C
  • LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C

    Product Details:

    Place of Origin: Germany
    Brand Name: LENZE
    Certification: CE
    Model Number: E82EV222K4C

    Payment & Shipping Terms:

    Minimum Order Quantity: 1pcs
    Packaging Details: carton
    Delivery Time: in stock
    Payment Terms: T/T, Western Union, MoneyGram
    Supply Ability: 100pcs/week
    Contact Now
    Detailed Product Description
    LENZE: LENZE E82EV222K4C: E82EV222K4C
    Germany: Germany Color: Black
    Material: Iron Temperature: 20-90
    Wire: Wire

    LENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4CLENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4CLENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4CLENZE E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C E82EV222K4C

    Time synchronization
    ● Identification and maintenance data
    Also allow for any possible foreseeable errors in the tests. This prevents you from putting
    persons or equipment at risk during operation. PRONETA provides commissioning support. You can find more information on
    Commissioning requirements
    Note
    Performing tests
    PRONETA in the section Software (PaBefore the first power-on, check the installation and the wiring of the R/H redundant
    You must ensure the safety of your plant. You therefore need to run a complete functional
    test and make the necessary safety checks before the final commissioning of a plant.
    system.
    Questions for checking
    The following questions provide instructions for checking your system in the form of a
    checklis

    Rack
    ● Are the mounting rails firmly mounted to the wall, in the frame, or in the cabinet?
    ● Are the cable ducts correctly installed?
    ● Have the minimum clearances been observed?
    Grounding concept
    ● Are the mounting rails connected to the protective conductors?
    ● If applicable, are all further protective conductor connection points on the R/H
    redundant system connected to the protective conductor? Has the protective conductor
    been tested?
    ● Are the required equipotential bonding cables connected with low impedance to the
    relevant sections of the plant?
    Module installation and wiring
    ● Are all the modules inserted / installed in accordance with the installation plan and
    configuration with STEP 7 and screwed firmly to the mounting rails?
    ● Have all synchronization modules been installed and locked in the H redundant
    system? You should hear the modules click into place in the module slots.
    ● Are all redundancy connection connectors in the H redundant system correctly
    connected to the LC sockets? You should hear the connectors click into place in the LC
    sockets.
    ● Are the redundancy connections (PROFINET cable) between the CPUs in the R
    redundant system connected to the correct ports of PROFINET interface X1? The ports
    used must correspond to the configuration in STEP 7.
    ● Are the PROFINET devices in the R/H redundant system connected as a
    PROFINET ring?
    System power supply or load power supply
    ● Are all system power supplies and load power supplies switched off?
    ● Is the power cable connector correctly wired?
    ● Has the connection to line voltage been established?The SIMATIC memory cards are as delivered or have been formatted and are not writeprotected.
    ● The two CPUs of the R/H redundant system have the same function and
    firmware version. You can find more information in the section Firmware update
    (Page 272).
    Commissioning procedure
    To commission the R/H redundant system, we recommend the following procedure:
    Table 9- 1 Procedure for commissioning SIMATIC R/H
    Step Procedure Further information
    1 Configure hardware in STEP 7 Section Configuration (Page 136)
    2 Create user program Section Programming the R/H
    (Page 148) and STEP 7 online help
    3 Insert required modules Section Installation (Page 96)
    4 Wire configuration (supply voltage, PROFINET ring, redundancy Section Configuration (Page 136)
    2 Create user program Section Programming the R/H
    (Page 148) and STEP 7 online help
    3 Insert required modules Section Installation (Page 96)
    4 Wire configuration (supply voltage, PROFINET ring, redundancy connections)
    Section Wiring (Page 108)
    5 Insert SIMATIC memory cards in the CPUs Section Removing/plugging in SIMATIC
    memory cards (Page 181)
    6 Switch on CPUs and system power supply Section First power-on of the CPUs
    (Page 184)
    7 CPU pairing Section CPU pairing (Page 184)

     

     

    Contact Details
    Guang Zhou Lai Jie Electric Co.,Ltd

    Contact Person: Mr. Tommy

    Tel: 86-020-87268766

    Fax: 86-020-87269099

    Send your inquiry directly to us (0 / 3000)