Place of Origin: | Germany |
Brand Name: | LENZE |
Certification: | CE |
Model Number: | E82EV222K4C |
Minimum Order Quantity: | 1pcs |
---|---|
Packaging Details: | carton |
Delivery Time: | in stock |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 100pcs/week |
LENZE: | LENZE | E82EV222K4C: | E82EV222K4C |
---|---|---|---|
Germany: | Germany | Color: | Black |
Material: | Iron | Temperature: | 20-90 |
Wire: | Wire |
Time synchronization ● Identification and maintenance data |
Also allow for any possible foreseeable errors in the tests. This prevents you from putting persons or equipment at risk during operation. PRONETA provides commissioning support. You can find more information on |
Commissioning requirements Note Performing tests |
PRONETA in the section Software (PaBefore the first power-on, check the installation and the wiring of the R/H redundant |
You must ensure the safety of your plant. You therefore need to run a complete functional test and make the necessary safety checks before the final commissioning of a plant. |
system. Questions for checking The following questions provide instructions for checking your system in the form of a checklis |
Rack
● Are the mounting rails firmly mounted to the wall, in the frame, or in the cabinet?
● Are the cable ducts correctly installed?
● Have the minimum clearances been observed?
Grounding concept
● Are the mounting rails connected to the protective conductors?
● If applicable, are all further protective conductor connection points on the R/H
redundant system connected to the protective conductor? Has the protective conductor
been tested?
● Are the required equipotential bonding cables connected with low impedance to the
relevant sections of the plant?
Module installation and wiring
● Are all the modules inserted / installed in accordance with the installation plan and
configuration with STEP 7 and screwed firmly to the mounting rails?
● Have all synchronization modules been installed and locked in the H redundant
system? You should hear the modules click into place in the module slots.
● Are all redundancy connection connectors in the H redundant system correctly
connected to the LC sockets? You should hear the connectors click into place in the LC
sockets.
● Are the redundancy connections (PROFINET cable) between the CPUs in the R
redundant system connected to the correct ports of PROFINET interface X1? The ports
used must correspond to the configuration in STEP 7.
● Are the PROFINET devices in the R/H redundant system connected as a
PROFINET ring?
System power supply or load power supply
● Are all system power supplies and load power supplies switched off?
● Is the power cable connector correctly wired?
● Has the connection to line voltage been established?The SIMATIC memory cards are as delivered or have been formatted and are not writeprotected.
● The two CPUs of the R/H redundant system have the same function and
firmware version. You can find more information in the section Firmware update
(Page 272).
Commissioning procedure
To commission the R/H redundant system, we recommend the following procedure:
Table 9- 1 Procedure for commissioning SIMATIC R/H
Step Procedure Further information
1 Configure hardware in STEP 7 Section Configuration (Page 136)
2 Create user program Section Programming the R/H
(Page 148) and STEP 7 online help
3 Insert required modules Section Installation (Page 96)
4 Wire configuration (supply voltage, PROFINET ring, redundancy Section Configuration (Page 136)
2 Create user program Section Programming the R/H
(Page 148) and STEP 7 online help
3 Insert required modules Section Installation (Page 96)
4 Wire configuration (supply voltage, PROFINET ring, redundancy connections)
Section Wiring (Page 108)
5 Insert SIMATIC memory cards in the CPUs Section Removing/plugging in SIMATIC
memory cards (Page 181)
6 Switch on CPUs and system power supply Section First power-on of the CPUs
(Page 184)
7 CPU pairing Section CPU pairing (Page 184)